Solar PV development
Project scope
(RED III) a solar photovoltaic (PV) farm and all associated works. This application involves the installation of 145MW of solar PV over an approximate area of 148 hectares, including 41 no. transformers and 1 no. RMU. The proposed development will utilise 1 no. existing construction entrance, and 2 no. existing operational entrances. The proposed development will utilise existing internal access tracks and will involve the construction of approximately 7km of new internal access tracks. The site is centred at X (ITM) 608494.8003 and Y (ITM) 716388.2449. Planning permission is sought for a period of 10 years, with an operational life of 40 years from the date of commissioning. A Natura Impact Statement will also be submitted to the Planning Authority with this application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
townlands of Stonestown Kilcamin Crancreagh Derrinlough , Co. Offaly , Ireland
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
GP Joule Ireland Limited
Also electrical in Offaly
Research and development energy storage equipment with modular containers.
2660378 · 15 Jul 2026
Restaurant extensions: ground and first floor, kitchen fit-out, window alterations.
2660366 · 09 Jul 2026
Terrace of 4 two-storey houses with associated site works.
2660362 · 09 Jul 2026
Astroturf pitch extensions, floodlights, walking track, site works.
2660365 · 09 Jul 2026
41-unit residential development: 33 houses, 1 apartment block, demolition.
2660361 · 09 Jul 2026
Energy storage and battery container infrastructure with electrical works.
2660353 · 03 Jul 2026