Solar PV development
Project scope
(RED III) a period of 10 years for a grid connection for the previously approved, but not yet constructed, solar energy development (Planning ref: 21/598). This will consist of installation of medium voltage (MV) electrical cabling between the solar arrays and the existing Philipstown 110kV substation, including a 8m section of cable within the R401 and a 56m section of overhead line and associated pole sets to facilitate crossing of the Figile River. A Natura Impact Statement (NIS) has been submitted as part of the application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413)
Townlands of Ballykilleen Ballinowlart North and Kilcumber , . , Co. Offaly
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Kilcush Solar Farm Ltd
Also electrical in Offaly
Research and development energy storage equipment with modular containers.
2660378 · 15 Jul 2026
Restaurant extensions: ground and first floor, kitchen fit-out, window alterations.
2660366 · 09 Jul 2026
Terrace of 4 two-storey houses with associated site works.
2660362 · 09 Jul 2026
Astroturf pitch extensions, floodlights, walking track, site works.
2660365 · 09 Jul 2026
41-unit residential development: 33 houses, 1 apartment block, demolition.
2660361 · 09 Jul 2026
Energy storage and battery container infrastructure with electrical works.
2660353 · 03 Jul 2026