Solar PV development
Project scope
a 38kV hybrid grid connection cable and is intended to connect the permitted Ballyboughlin Solar Park (Pl. Ref. 24/60338) to the existing Clara 38kV Substation. The proposed development will consist of: •The laying of a 38kV underground electrical grid connection cable (c.4.5km in length), utilising public roads, and the construction of and overhead electrical grid connection cable (c. 0.898km in length), from the existing Clara 38kV substation to the permitted Ballyboughlin Solar Park (Pl. ref. 24/60338). • The proposed development includes all associated site development and site enabling works and ancillary infrastructure, including 5 no. joint bays and 38kV underground ducting and cabling. A Natura Impact Statement (NIS) accompanies this Planning Application
Townlands of Lehinch Kilcoursey Kilbride Aghamore Raheen and Clara , near Clara , Co. Offaly
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Engie Developments Ireland Limited
Also electrical in Offaly
Research and development energy storage equipment with modular containers.
2660378 · 15 Jul 2026
Restaurant extensions: ground and first floor, kitchen fit-out, window alterations.
2660366 · 09 Jul 2026
Terrace of 4 two-storey houses with associated site works.
2660362 · 09 Jul 2026
Astroturf pitch extensions, floodlights, walking track, site works.
2660365 · 09 Jul 2026
41-unit residential development: 33 houses, 1 apartment block, demolition.
2660361 · 09 Jul 2026
Energy storage and battery container infrastructure with electrical works.
2660353 · 03 Jul 2026