Solar PV development
Project scope
A PERIOD OF 10 YEARS, WITH AN OPERATIONAL LIFE OF 40 YEARS FROM THE DATE OF COMMISSIONING. THE PROPOSED DEVELOPMENT COMPRISES OF A SOLAR PHOTOVOLTAIC (PV) FARM AND ALL ASSOCIATED WORKS. THIS APPLICATION INVOLVES THE INSTALLATION OF 145MW OF SOLAR PV OVER AN APPROXIMATE AREA OF 148 HECTARES, INCLUDING 41 NO. TRANSFORMERS AND 1 NO. RMU. THE PROPOSED DEVELOPMENT WILL UTILISE 1 NO. EXISTING CONSTRUCTION ENTRANCE, AND 2 NO. EXISTING OPERATIONAL ENTRANCES. THE PROPOSED DEVELOPMENT WILL UTILISE EXISTING INTERNAL ACCESS TRACKS AND WILL INVOLVE THE CONSTRUCTION OF APPROXIMATELY 7KM OF NEW INTERNAL ACCESS TRACKS. THE SITE IS CENTRED AT X (ITM) 608494.8003 AND Y (ITM) 716388.2449. A NATURA IMPACT STATEMENT WILL ALSO BE SUBMITTED TO THE THE PLANNING AUTHORITY WITH THIS APPLICATION. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE 2023/2413).
STONESTOWN , KILCAMIN CRANCREAGH , DERRINLOUGH CO.OFFALY
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
GP JOULE IRELAND LIMITED
Also solar pv in Offaly
143.4 hectare solar PV renewable energy development on 143.4 hectares.
2660319 · 18 Jun 2026
New MMC training building with classroom block and roof-mounted PV panels.
2660307 · 05 Jun 2026
Large-scale solar PV farm development on 143.4 hectares with grid infrastructure.
2660287 · 28 May 2026
145MW solar PV farm across 148 hectares with transformers and access tracks.
2660237 · 01 May 2026
28.1 hectare solar PV development with transformers, cabling and access infrastructure.
2660233 · 30 Apr 2026
Solar PV ground-mounted development across 28.1 hectares.
2660216 · 23 Apr 2026