Warehouse and logistics development
Project scope
- Replacement of existing double height external timber screens & doors to gym hall with a glazed curtain walling system with solid aluminium spandrels and doors; - Replacement of existing high level external single glazed system to the gym hall with double glazed curtain wall system; - Installation of 2 x Air Source Heat Pumps with 2.8m high perimeter screen enclosures; - Installation of a vandal resistant EVC car charging local electrical enclosure, distribution board and dual car charging outlet.
Coláiste Lorcáin , Castledermot , Athy
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Individual applicants’ names are held out of public view on ConstructionLeads.ie for privacy reasons. Where an agent is recorded, contractors quoting for the works can find their details in the Decision-maker panel on this page.
Also glazing in Kildare
Attic conversion with rear dormer, roof windows, storage space.
2660413 · 16 Apr 2026
Front living room extension, roof canopy, garage conversion.
2660416 · 16 Apr 2026
Alterations with window changes, additional ensuite bathrooms.
2660410 · 15 Apr 2026
Single storey rear extension, pitched roof, internal reconfig, conservatory demolition.
2660403 · 14 Apr 2026
Modifications to extensions including demolition and fenestration changes.
2660389 · 10 Apr 2026
Headquarters office and six industrial warehouse units with parking and EV infrastructure.
2660386 · 09 Apr 2026