appliedData centres·Westmeath County Council

Data centres planning project

Project scope

amendments to the Energy Storage System (ESS) facility (consented under Westmeath County Council Planning Ref: 21/532) The amendments are as follows: (i) the removal of the Battery Energy Storage System (BESS) compound and contents within, including the IPP building and all ancillary items, as previously consented, (ii) reconfiguration of the synchronous condenser compound (area remains at 9,309sqm), (iii) increase the size of the horizontal synchronous generator building and reposition within the compound, (iv) increase of control modules from 5 No. to 8 No., (v) reposition and alteration of associated bunded transformers and electrical plant, (vi) reposition external cooling fans, (vii) provision of a new external containerised diesel generator, and (viii) all ancillary development, including; lightening mast protection, perimeter fencing with access gates, landscaping, lighting, car parking, internal access roads, underground electrical cable routes, and all civil engineering works for the disposal of surface water

Kiltotan and Collinstown and Oldtown , Rochfortbridge , County Westmeath

Street view of the planning site
Satellite view at 53.39946, -7.32050

Satellite · Zoom 19

Trades in scope

Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.

Applicant

Lumcloon Energy Limited