appliedResidential·Tipperary County Council

Residential extension and alterations

Project scope

the renovation and extension of existing dwelling to include removal of existing cottage roof and construction of a new roof with an increased height of 850 mm to accommodate a loft storage area, new windows to side gables, new entrance door and bathroom window to front elevation; to construct a one and half storey rear extension to accommodate a hallway, kitchen/dining area, and bedroom at ground floor level, two bedrooms and bathroom at first floor level; to replace existing septic tank with a new wastewater treatment system and percolation area

Ballyboy , Upperchurch , Thurles Co. Tipperary

Street view of the planning site
Satellite view at 52.68711, -7.98156

Satellite · Zoom 19

Trades in scope

Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.

Applicant

Unlock applicant

Applicant identity + registered company (when applicable) unlocks with early access.