Industrial planning project
Project scope
Permission for the development which will consist of: i. Minor adjustments to existing Novo Nordisk substation building to include, gas storage enclosure (area 1.8 sqm), façade alterations, replacement access doors, and adjustments to roof membrane and parapet cladding. ii. Decommissioning and removal of 2 no. existing 38kV transformers (identified as T41 and T42), with transformer height of c. 4.0m. iii. Installation of 1 no. new 38kV transformer (height of c. 4.3m) with associated bunded area and c. 5.0m fire wall, at the existing electrical equipment yard. iv. Construction of adjoining electrical equipment yard with an area of c. 352sq.m, and installation of 1 no. 38kV transformer (height of c. 4.3m) (c. 21.28 sq.m) with associated bunded area and c. 5.0m fire wall. v. All associated infrastructure including provision of security fencing and gates with a maximum height of c. 2.5m at electrical equipment yards, site drainage, utility connections, and all ancillary site and development works at
Monksland Industrial Estate , Athlone , Co. Roscommon
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Novo Nordisk Production Ireland Limited
Also mep consult in Roscommon
School biomass heating system with modular building, plantroom upgrades and gas line.
2660355 · 16 Jul 2026
Battery energy storage system with 110kV substation on 2.33 hectares.
2660302 · 22 Jun 2026
New two-storey detached dwelling with public services connection.
2660288 · 12 Jun 2026
Single and two-storey new dwelling with treatment system.
2660284 · 09 Jun 2026
Battery energy storage system with 2.33 hectare compound near ESB substation.
2660243 · 23 May 2026
Single storey extension, elevational changes, garage, services connection.
2660226 · 14 May 2026