Data centres planning project
Project scope
Permission is sought for Grid System Services Limited, applying for a 10 year permission to develop an Energy Storage System , which will connect to the adjoining ESB Tonroe 110kV Electricity Substation on land at Ballyoughter, Ballaghaderreen, County Roscommon. The proposed development will have a projected life span of 35 years. The development will consist of the construction of 1) enclosed battery energy storage system within a site compound on a total of up to c.2.33 hectare site, to include: 1 no. single storey 110kV customer substation, control and switch rooms; up to 44 battery blocks on concrete support structures including heating, ventilation and air conditioning unit (HVAC units); up to 11 transformer and inverter units; including access tracks and site entrance along existing roadway; associated electrical cabling and ducting; security gates, 2.6m palisade perimeter security fencing; CCTV system; landscaping works and all other associated ancillary infrastructure at
Ballyoughter , Ballaghaderreen , Co. Roscommon.
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Grid System Services Ltd NA
Also groundworks in Roscommon
Domestic dwelling with garage and wastewater treatment system.
2560389 · 20 Jul 2026
Domestic dwelling with garage, treatment system, and site development works.
2560438 · 20 Jul 2026
Discount foodstore, café/restaurant, retail unit development.
2660258 · 17 Jul 2026
School biomass heating system with modular building, plantroom upgrades and gas line.
2660355 · 16 Jul 2026
Gated vehicular access and hardstanding for temporary standby generator.
2660356 · 16 Jul 2026
Revised dwelling with increased floor area, new garage and wastewater system.
2660354 · 16 Jul 2026