Public / civic planning project
Project scope
The Hospital Chapel within the Hospital Campus is a Protected Structure (RPS. Reg. 1649). No works are proposed to the Protected Structure as part of this application. The proposed development will consist of a construction of the 3rd floor extension comprising of 16no. acute inpatient bed spaces with associated clinical and support accommodation including a link corridor at the 3rd floor level connecting the new medical ward with the southern stairwell. The works will also include a vertical extension of existing southern and northern stairwell adjoining the hospital street; a construction of 2no 4-storey high evacuation lifts with associated protected lobby at each level, as well as provision of additional 16no parking spaces. A permission is also sought for retention of the extended plantroom at 2nf floor of existing acute inpatient ward.
University Hospital Limerick, St. Nessan's Road, Dooradoyle, Limerick, V94 F858
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Individual applicants’ names are held out of public view on ConstructionLeads.ie for privacy reasons. Where an agent is recorded, contractors quoting for the works can find their details in the Decision-maker panel on this page.
Also steel in Limerick
Steel frame cattle shed with slurry tank.
2660829 · 21 Jul 2026
Workshop conversion for powder coating and sandblasting operations.
2660588 · 20 Jul 2026
Poultry house, egg store, feed bins, manure shed complex.
2660808 · 16 Jul 2026
Ground floor reconfiguration and 160m2 first floor extension with offices.
2660799 · 14 Jul 2026
Agricultural shanette shed construction, 9.3x4.9m, 3.3m high.
2660792 · 11 Jul 2026
Ten light industrial warehouse units with parking and upgraded road access.
2660780 · 09 Jul 2026