Solar PV development
Project scope
Renewable Energy Directive (REDIII) Development. Application for a period of 10 years to construct and complete a solar PV energy development (renewable energy development) with a total site area of 137.7 hectares, comprising of the construction of PV panels mounted on metal frames, inverters, internal access tracks, perimeter fencing with CCTV cameras and access gates, electrical cabling and ducting, creation of a new access off the L8017, a temporary construction compound, landscaping and all ancillary infrastructure and associated works. The solar farm would be operational for 40 years. A Natura Impact Statement (NIS) has been prepared in respect of this application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
within the townlands of , Ballindrum and Mullamast , Co. Kildare
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Ballindrum Solar Limited
Also solar pv in Kildare
Ground-mounted solar farm with transformers and underground cabling.
2660343 · 31 Mar 2026
Rebuild two-storey dwelling, extend, reorient garage, add solar panels.
2660143 · 17 Feb 2026
Solar PV panels installation on existing warehouse rooftop.
2660069 · 27 Jan 2026
Rebuild two-storey dwelling, garage reorientation, solar panels.
2660052 · 20 Jan 2026
Bungalow extension, dormer, driveway, wastewater system, solar panels.
2660043 · 16 Jan 2026
Dormer extension to storey-and-half; 2 outbuildings; solar PV; pool and gym
2660011 · 07 Jan 2026