The development will consist of the demolition of the existing community hall building ‘Ionad Pobail’ to facilitate the construction of (A) a two-storey Community Center containing a sport’s hall; 2no. changing rooms with showering facilities; a gym; toilets and associated stores at ground floor level and a community room; a meeting room; an office; a tea station, a store and toilets at first floor level; (B) a detached kiosk building containing a plant room and heat pump enclosure and; (C) all associated site works at Ionad Pobail, Garraí na dTor, Lios Póil, Co. Chiarraí. The proposed works are in lieu of those permitted under Planning Refs 24/60638 and 25/60153.
Ionad Pobail , Garraí na dTor , Lios Póil Co. Chiarraí
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Applicant identity + registered company (when applicable) unlocks with early access.
Also demolition in Kerry
Rear extension and storage shed demolition with site works.
2660640 · 09 Jul 2026
Demolitions, extensions and wastewater treatment system installation.
26110 · 03 Jul 2026
Demolish storage buildings, construct replacement shed and services.
2660605 · 01 Jul 2026
Change use retail to residence; refurbish, repair facade, install heritage windows.
2660609 · 01 Jul 2026
Change use retail to residence; refurbish, repair facade, install heritage windows.
2660608 · 01 Jul 2026
Demolish storage sheds, construct two-storey storage building for restaurant.
2660594 · 26 Jun 2026