development will consist of: Demolition and alteration of the existing semi-detached building, including, (i) Demolition of the existing single-story lean-to roof structure to the front (south) and side (east) elevations; including the removal of the chimney stack (ii) Alteration of the existing ground floor layout, including upgrading works to the front (southern) elevation, together with a single-storey extension to the rear (northern) elevation and a first-floor extension to the front (southern) and side (eastern) elevations; including all associated site works.
5 sweetbriar Park , Tramore , Co Waterford
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Individual applicants’ names are held out of public view on ConstructionLeads.ie for privacy reasons. Contractors quoting for the works will reach out through the agent below.
Also demolition in Waterford
Milking parlour complex with dairy, plant, storage, holding yard and demolition.
2660497 · 07 Jul 2026
Demolish storage, build three-storey building with 2 residential units.
2660090 · 06 Jul 2026
Restore quarry site to agricultural use, import 270,000m³ inert materials.
2660489 · 02 Jul 2026
Single and two-storey extension, demolition, renovation and wastewater system.
2660492 · 02 Jul 2026
Two single storey extensions, demolition of garage and structures.
2660481 · 29 Jun 2026
Demolish extension, build dormer, alter dwelling entrance.
2668 · 26 Jun 2026