Industrial planning project
Project scope
RED III development which will consist of the provision of new electrical plant and equipment, including; 1 no. existing Arc Suppression Coil to be retired and replace with 1 no. new Arc Suppression Coil, extension to control room building (c. 27 m2), associated and ancillary outdoor electrical equipment and other apparatus, including installation of underground cables; and all other ancillary works. (This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply)
ESB Doon 110 kV Substation , Ballyvaughan , Clonmel Co. Tipperary
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Electricity Supply Board
Also electrical in Tipperary
Two-storey rear extension and domestic garage with internal works.
2660684 · 15 Jul 2026
47 dwellings completion and new construction with estate infrastructure.
2660683 · 15 Jul 2026
Single dwelling with garage, well, wastewater treatment system.
2660685 · 15 Jul 2026
Truck wash bay with ancillary shed and lighting infrastructure.
2660681 · 14 Jul 2026
60 dwellings demolition and new construction with infrastructure.
2692 · 14 Jul 2026
65.9 hectare solar PV energy development with transformers.
2660672 · 10 Jul 2026