Industrial development
Project scope
RED III application for development which comprises the construction of an anaerobic digestion facility to produce renewable biomethane, CO2 (which will be captured), and a bio-based fertiliser from organic material. The total gross floor area of the proposed development (including internal plant areas and ancillary structures) will be c. 3,301 sq.m. The development will consist of the following: • 3 no. digesters (all c. 15.5m in height), 2 no. digestate storage structures (c. 15.5m and c. 12m in height), a liquid feed tank (c. 4m in height) and a pump room and O2 generation structure (with a GFA of c. 27 sq.m. and a height of c. 2.6m), located in the northern section of the site. • 4 no. pasteurisation tanks (each c. 6m in height), a post pasteurisation cooling tank (c. 4m in height) and a pre fertiliser manufacturing tank (c. 4m in height), located to the southeast of the main digesters. • A part single-storey and part two-storey reception hall (with a gross floor area (GFA) of c. 1,964 sq.m. and an overall height of c. 16.5m) to accommodate a laboratory, panel room, tool store, workshop, and storage areas, with a liquid feed intake adjacent to the reception hall, located to the centre of the site. • Two pump house structures, each with a height of c. 2.6m and GFAs of 14 sq.m. and 21 sq.m., will be provided to the west and east of the reception hall building respectively. • A single-storey solid digestate storage and a nutrient recovery building (with a GFA of c. 880 sq.m and an overall height of c. 12.4m) located to the east of the reception hall, in the central portion of the site. • Odour abatement plant (with an overall height of c. 7m) and equipment and a digestate offtake area will be provided to the east of the solid digestate storage and nutrient recovery building. • Construction of an ESB substation (with a GFA of c. 27 sq.m and a height of c. 3.4m), a grid injection unit (with a GFA of c. 22 sq.m and a height of c. 2.8m) (which will be connected to the gas grid by way of an underground connection by Gas Networks Ireland), a GNI / grid offtake skid, and a fire water storage tank (with a height of c. 7.7m) in the southern portion of the site. • Construction of 2 no. CO2 tanks (c. 10.7m in height), a CO2 loading pump (c. 2.6m in height), CO2 auxiliaries (c. 2.6m in height), CO2 liqueufactor (with an overall height of c. 8.2m), a CO2 compressor (with an overall height of c. 5.9m) and a CO2 pre-treatment skid (c. 3.5m in height), located in the we
Ballynilard , Tipperary , Co. Tipperary
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Applicant identity + registered company (when applicable) unlocks with early access.
Also groundworks in Tipperary
Dwelling extension, roof work, garage rebuild and site works.
2660695 · 17 Jul 2026
Warehouse conversion to 11 apartments, four-storey with balconies.
2660698 · 17 Jul 2026
Septic tank replacement and retention of domestic extensions.
2697 · 17 Jul 2026
Dwelling extension, internal refurbishment and wastewater treatment.
2660700 · 17 Jul 2026
New dwelling with garage and wastewater treatment system.
2660692 · 16 Jul 2026
New dwelling with carport, garage and wastewater treatment.
2660691 · 16 Jul 2026