Solar PV development
Project scope
Permission for a 10-year planning permission for development at this site at Esker, Cuilmore, Cloonrallagh, Corraree and Ballygatta, Newtown, Ardnanure, Curraghaleen, Cloonakille, Rooskagh, Bellanamullia and Monksland Co. Roscommon. This development will consist of the construction of a Solar PV development, an on-site 38kV Substation and Battery Energy Storage System, along with associated 38kV underground cable connecting the proposed Solar PV Farm and BESS to the existing Athlone ESB 110kV Substation and all associated works on a total area of ca. 116 hectares. The Solar Farm, 38kV substation and Battery Energy Storage System will be located on a site that is ca. 110ha and located within the townlands of Esker, Cuilmore, Cloonrallagh, Corraree and Ballygatta, Co. Roscommon and will consist of: I. Solar PV panels laid out in arrays across the Site of ca. 110ha on ground-mounted frames; II. 48 BESS units; III. 15 transformer units; IV. One 38kV substation building (13.7m x 7.3m); V. Underground electrical and communications cabling within private lands and minor local road; VI. Polemounted security cameras; VII. Perimeter security fencing (2m high) and security gates; VIII. Three new entrances and upgrade works of one existing entrance; IX. Two primary temporary construction compounds and three satellite temporary construction compounds; X. 16 new drainage ditch crossings and one upgraded culvert; XI. Internal access tracks between the solar arrays and the site entrances ; and, XII. All associated ancillary site development, landscaping and reinstatement works. The 38kV underground cabling will be located on a site that is ca. 6ha and will traverse the townlands of Monksland, Bellanamullia, Cloonakille, Rooskagh, Curraghaleen, Cloonrollagh, Ardnanure, Newtown and Cuilmore, Co. Roscommon and will consist of: I. Ca. 9.56km of underground 38kV cable, three power cables and one fibre communications, beneath private and public roads (L76371, L76374, L76394, L2047, L2026, L7577, L75771 and R362); II. 12 Joint Bays; III. Two HDD Crossings; IV. Associated works including road carriageway passing places; and, V. All associated ancillary works above and below ground. The operational lifespan of the development will be 40 years, and planning permission is requested for this duration. A Natura Impact Statement accompanies the planning application. This development is covered by the provisions of the Renewable
Monksland Bellanamullia Cloonakille , Rooskagh Curraghaleen Cloonrollagh Ardnanure Newtown and Cuilmore , Co. Roscommon
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Cuilmore Solar Ltd.
Also solar pv in Roscommon
Replace foodstore with new single storey building, parking, PV panels and landscaping.
2660191 · 28 Apr 2026
Solar PV farm expansion with ground-mounted arrays and inverter station.
2660170 · 17 Apr 2026
Building alterations, solar panels, container storage and entrance widening.
2560504 · 22 Oct 2025
Medical centre conversion to dwelling with extension and solar PV.
2560488 · 14 Oct 2025
Retention of solar panels, signage, Ad Blue tank on shop building.
2560442 · 15 Sept 2025
Ground-mounted PV panel array installation in public car park.
2560367 · 25 Jul 2025