Industrial development
Project scope
Permission for development at Monksland Industrial Estate, Athlone, County Roscommon. The development will consist of: Minor façade alterations to Central Utility Building (CUB), comprising of replacement of no.2 existing single open-mesh doors with no.2 double access doors and new louvered façade on the south elevation; provision of new door on west elevation; provision of extractor fans on north and south elevation; and installation of no. 3 roof extract vents. Installation of plant comprising; 3 no. chiller units, each with a floor area of c.19.5sq.m and a maximum height of c. 2.8m, with associated pipe rack to a maximum height of c.5.7m and associated flues with a maximum height of c. 13.8m ; 3 no. cooling towers, each with a floor area of c.24 sq.m each and a maximum height of c. 7.3m, with associated pipe rack to a maximum height of c.7m; and 1 no. buffer tank of c.3.3m in diameter and 9.3m in height. Provision of 1 no. heat pump comprising of a floor area of c.8 sq. m, with a maximum height of approximately 2.3m and associated pipe rack to a maximum height of c. 9.2m Construction of a fire wall of c.2.4m high and c.41.2m in length. All associated infrastructure including provision of drainage infrastructure, utility connection and all ancillary site and development works (This application relates to a development on a site which comprises of an activity requiring an Industrial Emissions Licence: Licence No P0100-02) at
Monksland Industrial Estate , Athlone , County Roscommon
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Novo Nordisk Production Ireland Limited
Also hvac in Roscommon
Discount foodstore, café/restaurant, retail unit development.
2660258 · 17 Jul 2026
School biomass heating system with modular building, plantroom upgrades and gas line.
2660355 · 16 Jul 2026
Refurbish derelict house with rear extension and treatment system.
2660018 · 02 Jul 2026
Commercial warehouse, light industrial and showroom building.
2660269 · 01 Jun 2026
Warehouse to manufacturing conversion with clean room fit-out.
2660262 · 29 May 2026
Sports facility upgrade: dressing rooms, extensions, gymnasium, lighting.
2660261 · 28 May 2026