Residential extension and alterations
Project scope
Permission and Retention Permission: 1.To refurbish existing house to include alterations to elevations including removal of existing dormer windows and first floor, to restore house to its original bungalow form; 2. To demolish existing rear extension and front porch; 3. To construct new rear and side extension to the house; 4. To install an upgraded wastewater treatment system and percolation area; 5. To replace the front boundary wall with post and rail fence between existing piers, extended to the east with matching new piers; 6. To retain the existing domestic steel shed; 7. To retain the temporary existing mobile home structure for a period not exceeding 18 months to provide owners living accommodation during construction works, and to carry out all ancillary site development works at
Corroy , Ballinameen , Boyle
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Individual applicants’ names are held out of public view on ConstructionLeads.ie for privacy reasons. Where an agent is recorded, contractors quoting for the works can find their details in the Decision-maker panel on this page.
Also demolition in Roscommon
Demolish outbuilding, two-storey extension, upgrade wastewater treatment system.
2660352 · 15 Jul 2026
Protected structure conversion to residence, extension demolition, new access.
2650 · 30 Jun 2026
Community garden, games area, footpath, parking and demolition works.
2660311 · 25 Jun 2026
House refurbishment, rear extension demolition and reconstruction.
2660304 · 23 Jun 2026
Restaurant/café conversion to veterinary clinic with extension and parking.
2660308 · 23 Jun 2026
Conversion of hen house to three-bed dwelling with renovation and extension.
2646 · 18 Jun 2026