Solar PV development
Project scope
• 4 no. playing pitches (Pitch 1 and 2: synthetic all-weather playing pitches with floodlighting, and Pitch 3 and 4: grass playing pitches); • 1 no. grass training/warm-up pitch;• A single level facilities building (approximately 865 sq m gross floor space) with rooftop photovoltaic solar panel array (224 sq m) and associated building signage (4.5 sq m), to incl. entrance lobby, function room with servery and reception area, office/meeting room, weight/training room, multipurpose community room, medical/first aid room with toilet, equipment store, 5 no. spectator toilets (3 no. universal accessible), circulation corridor, universal access toilet, universal access change room with shower and toilet, plant room, storage/kit room, 2 no. referee facilities with shower and toilet, 2 no. change rooms with showers and toilets, and 6 no. change rooms with toilets; • 123 no. vehicle parking spaces arranged in 2 no. car parking areas with site lighting (12 no. EV, 6 no. disabled, 105 no. regular), dedicated vehicle set down area, dedicated coach/bus set down area, and coach/bus parking area; and • Hard and soft landscaping (incl. enhanced boundary treatment planting and ecological buffer biodiversity corridors), access road and vehicle circulation, pedestrian walkways, site lighting, services (incl. tertiary waste water treatment system comprising of proprietary secondary wastewater treatment plant with pumped discharged to raised tertiary treatment modules polishing filter bed, and SuDS based surface water management system comprising permeable paving, grasscrete, a series of stormwater bioretention swales/detention basins located on the site, hydrocarbon interceptor, flow control hydrobrake controlled outflow discharge to drainage ditch within site, and ultimately the Gageborough River), and all other ancillary and associated site development works above and below ground level. Access will be via a new vehicular entrance from the L6045 Local Road with associated road upgrade works to accommodate development related traffic movements at this site of approximately 11 hectares
Townland of Curraghboy , or Woodfield , Clara Co. Offaly
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Midlands Schoolboys/girls League CLG
Also groundworks in Offaly
New detached house with garage, septic tank and site works.
2660382 · 17 Jul 2026
Single storey entrance porch to existing dwelling.
2660377 · 16 Jul 2026
Independent living unit construction and outbuilding conversion to office.
2660380 · 16 Jul 2026
New dwelling house with garage, septic tank and bored well.
2660379 · 15 Jul 2026
Research and development energy storage equipment with modular containers.
2660378 · 15 Jul 2026
Design amendment to approved dormer bungalow with septic tank.
2660373 · 14 Jul 2026