EXTENSION OF DURATION OF PLANNING PERMISSION NA190965 - Refer to Addendum - the construction of an apartment and commercial scheme within two blocks with surface and basement car parking. Block A (front block) comprises a 3 storey building with a setback 3rd storey comprising of 2 no. ground floor retail/office units (346sq.m) with 11 apartment units in total (1no. 3 bed, 3 no. 2 bed and 7 no. of 1 bed units on the upper two floors). Block B (rear block) comprises a 5 storey building with a setback 5th storey comprising of 32 apartment units in total (15 no. of 2 bed and 17 no. of 1 bed units) and terraced roof garden. There are 43 apartment units in total (1x 3 Bed + 18 x 2 Bed + 24 x 1 Bed) with associated private amenity spaces with 52 car parking spaces in total (21 surface car spaces and 31 basement car spaces), cycle-parking facilities, secure bin storage facility and communal open space at ground level together with connection to all services including all ancillary site works
Site of the Former Brews Hill Filling Station and Former Irish National Foresters Hall , Brews Hill , Navan
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Individual applicants’ names are held out of public view on ConstructionLeads.ie for privacy reasons. Contractors quoting for the works will reach out through the agent below.
Also concrete in Meath
Storey-and-a-half independent living unit on garage footprint.
2660574 · 09 Jul 2026
Four-bedroom bungalow with garage, wastewater treatment and well.
26176 · 09 Jul 2026
Two-storey dwelling with revised layout, garage, wastewater treatment system.
26175 · 09 Jul 2026
Two-storey extensions to front, side and rear of dwelling.
2660849 · 08 Jul 2026
Wastewater treatment plant upgrade and outfall infrastructure expansion.
2660850 · 08 Jul 2026
Rear extension, refurbishment, garage, wastewater treatment system.
2660848 · 08 Jul 2026