Demolition and redevelopment
Project scope
the End of Waste activities within the footprint of the existing site, where same activities include: 1) Acceptance, processing and recovery of in-coming inert waste material arising from construction and demolition activity, comprising concrete, bricks, soil or other such similar material, to become a certified product for reuse in construction related industries; 2) The maximum annual intake of incoming waste material shall not exceed of 24,500 tonnes; 3) The processing will include standard crushing and screening using the existing quarry plant; The site infrastructure for the proposed End of Waste activities will be limited to bays comprising storage and processing; 4) AII ancillary site development works. The proposed development seeking planning permission will require a 'Waste Facility Permit' for the acceptance and processing of the in-coming waste, which will be sought through a separate application to Longford County Council. The proposed development seeking planning permission will require registration with Environmental Protection Agency for End of Waste recovery under the National End-of Waste Decision EoW-N00l/2023 criteria
Molly , Aughnacliffe , Co. Longford
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Mark Cadam Ltd.
Also groundworks in Longford
Two-storey house with detached garage, increased site, relocated entrance.
2560188 · 20 Jul 2026
Detached garage and storage structure.
2660101 · 20 Jul 2026
Two-storey dwelling with garage, boundary wall, wastewater treatment.
2660025 · 20 Jul 2026
Industrial storage building construction adjacent to existing warehouse.
2660228 · 15 Jul 2026
School extension with 2 special education rooms and internal alterations.
2660229 · 15 Jul 2026
9-unit apartment building with demolition of existing terraced house.
2660225 · 10 Jul 2026