Public / civic planning project
Project scope
•Construction of new 1.5m to 1.8m wide footpaths through village. •Repair/Upgrade of existing footpaths through village. •Relocation of existing Pedestrian crossing to new location outside the Church to Ash Hall •Removal of 14m approx. of existing boundary wall at Ashford Pre-school, setting back and rebuilding of wall to facilitate construction of footpath. •Removal of 35m approx. of existing boundary wall at property beside The Village Inn, setting back and rebuilding of wall to facilitate construction of footpath. •Removal of 50m approx. of hedgerows north of village, construction of 1.2m high wall with 1.8m high piers with steel fence panels between piers for a 25m section. •1.2m high TII specification fencing for 25m section. •Installation of new drainage works. •Installation of speed ramps through village. •Installation of new tactile paving and drop kerbs. •Installation of new road markings. •Installation of appropriate Traffic signs. •Upgrade of existing public lighting
Ashford Village, Co. Limerick.
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Individual applicants’ names are held out of public view on ConstructionLeads.ie for privacy reasons. Where an agent is recorded, contractors quoting for the works can find their details in the Decision-maker panel on this page.
Also groundworks in Limerick
Demolish side extension, rebuild with new extension and site works.
2660834 · 22 Jul 2026
New detached dwelling with carport, wastewater treatment and site works.
26168 · 21 Jul 2026
Two-storey four-bedroom house with treatment unit and percolation area.
26169 · 21 Jul 2026
New dwelling, outbuilding, driveway and wastewater system.
2660830 · 21 Jul 2026
Cottage extension, entrance alteration and wastewater treatment.
2660826 · 21 Jul 2026
Two storage buildings at manufacturing plant.
2660827 · 21 Jul 2026