Industrial planning project
Project scope
the construction of a new high purity liquid nitrogen (HPN) facility, including 2no. 24.4m high storage tanks, 1no. 17.4 m high vacuum tank 2no. 11.6m high vaporizer tanks and 2no. 6.7m high absorber vessel tanks, together with associated plant and equipment, including a 4.934m high electrical switchroom building, alterations to existing equipment, and all associated services, drainage and site works on site of c.1,333sqm located adjacent to the existing high purity liquid nitrogen (HPN) facility off Ballynoe Road (private road) within the existing Analog Devices Campus. This is an existing Lower Tier Seveso site, and the development consists of modifications to an establishment within the meaning of the European Communities Chemicals Act (Control of Major Accident Hazards Involving Dangerous Substances) Regulations. The site operates under an Integrated Pollution Control (IPC) licence
Analog Devices B.V Limited,, Ballynoe Road, Cloughkeating Avenue, Raheen Business Park,, Ballycummin, Limerick
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Analog Devices International Unlimited Company
Also groundworks in Limerick
Demolish side extension, rebuild with new extension and site works.
2660834 · 22 Jul 2026
New detached dwelling with carport, wastewater treatment and site works.
26168 · 21 Jul 2026
Two-storey four-bedroom house with treatment unit and percolation area.
26169 · 21 Jul 2026
New dwelling, outbuilding, driveway and wastewater system.
2660830 · 21 Jul 2026
Cottage extension, entrance alteration and wastewater treatment.
2660826 · 21 Jul 2026
Two storage buildings at manufacturing plant.
2660827 · 21 Jul 2026