Agricultural development
Project scope
six (6) wind turbines with a tip height of 158m, a rotor diameter of 136m and all associated foundations and hardstanding areas. A 38kV on-site substation compound containing a substation building, associated electrical equipment and transformers with separate client side and ESB entrances. The building will contain a control room, switchgear room, ESB room and store room, underground electrical and communications cabling between the wind turbines and on-site substation. Grid Connection Option A: 2.54km-long 38kV underground cable connection from the on-site substation to the existing Carrons substation to the west of the site. Grid Connection Option B: Loop into the existing 38kV onsite overhead line via the proposed 38kV substation. A new temporary site entrance off the L1219 local road to the west of the permanent site entrance for the construction phase only. Upgrade of an existing farm entrance and access track off the L1219 local road in the northwest of the site to serve as a permanent site entrance for the wind farm when operational. Approximately 3.4km of new site access tracks with associated turning areas and drainage. This includes approximately 490m of temporary access tracks which will be reinstated following construction. Upgrade of approximately 470m of existing site access tracks. A 9m-long clear span bridge crossing of the Ahacronane River by an internal site access track to the northwest of turbine T1 and an associated 1.5m x 1.0m relief culvert. A permanent meteorological mast with a height of 90m, a foundation and hardstand. Two (2) material storage areas with a total capacity of approximately 39,300m3. A temporary construction compound with an area of approximately 1,375m2. All associated site development works, including drainage, diversion or undergrounding of low voltage powerlines, landscaping and revegetation. This planning application is accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) which have been prepared in respect of the construction, operation and decommissioning of the proposed development, and works to facilitate turbine delivery from the port of Foynes to the wind farm site entrance via L6188, N69, L1222, L1220 and L1219. The Applicant is seeking a 10-year planning permission and 35-year operational life, initiating from the date of full commissioning of the entire wind farm. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and the planning application is subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
within the townlands of Ballynisky, Graigoor, Ballyegny More, Kilbradran, Ballysteen, Dunmoylan, Carrons and Lisbane, Co. Limerick
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Ballynisky Green Energy Ltd.
Also groundworks in Limerick
Demolish side extension, rebuild with new extension and site works.
2660834 · 22 Jul 2026
New detached dwelling with carport, wastewater treatment and site works.
26168 · 21 Jul 2026
Two-storey four-bedroom house with treatment unit and percolation area.
26169 · 21 Jul 2026
New dwelling, outbuilding, driveway and wastewater system.
2660830 · 21 Jul 2026
Cottage extension, entrance alteration and wastewater treatment.
2660826 · 21 Jul 2026
Two storage buildings at manufacturing plant.
2660827 · 21 Jul 2026