Agricultural development
Project scope
We, ART Generation Limited, intend to apply for a 10-Year planning permission for development at this site located in the townlands of Ballytobin & Ballyhall, County Kilkenny. The development will consist of the construction of a Single Wind Turbine development on an 8.96-hectare site consisting of: - I. A single 4.26-megawatt (MW) wind turbine with an overall tip height of 159m, comprising a rotor diameter of 138m and a hub height 90m; II. Wind turbine foundation, crane hardstanding and assembly area; III. Temporary Construction Compound; IV. Upgrade of an existing field entrance to new wind farm site entrance; V. Upgrading and widening of existing access tracks; VI. New access tracks; VII. An on-site 20kV electrical substation, comprising of 2 Modular Substation Buildings; VIII. Electrical and communication cabling within private lands; IX. Tree felling, landscaping and reinstatement works; and X. All associated ancillary works. The operational lifespan of the development will be 35-years from the date of commissioning.
Ballytobin , Co. Kilkenny , Ireland
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Art Generation Limited
Also concrete in Kilkenny
Three serviced dwelling sites with treatment plants and wells.
2660459 · 17 Jul 2026
Covered spectator stand building with seating and accessibility.
2657 · 17 Jul 2026
Slatted cubicles shed construction for agricultural use.
2660454 · 15 Jul 2026
Two-storey four-bedroom dwelling with garage, treatment system and well.
2660451 · 15 Jul 2026
Split-level dwelling with undercroft garage and treatment system.
2660452 · 15 Jul 2026
Single storey dwelling with garage, borewell and treatment system.
2660448 · 14 Jul 2026