Hospitality development
Project scope
the repair and re-imagining of the upper parts of the Tower House and retention of a single storey extension to the Tower dining facilities, to the east of the Protected Structures, the retention of two self-catering lodges with adjacent covered outside seating, the Shepherds Bar with outside seating terrace and toilet block, the Octagonal Lounge and the Therapy Salon; to the west of the Protected Structures, the retention of a cold room facility in the east end of the Banqueting Rooms, change of use of former single storey outbuilding to Licenced bar with associated kitchen extension, store and toilet facilities, Marquee dining space in former yard and a cast iron & patent glazed pergola; to the north of the Hotel, the retention of the water softener shed, the single storey prefabricated offices & staff facilities, the cast iron & patent glazed pergola with fixed seating, the lean-to smoking area, and the double height glazed conservatory style ‘Orangerie’ bar; to the south of the Hotel, the retention of the service yard & associated structures, the hotel overflow car park, and the helipad
Barberstown Castle Hotel , Straffan , Co. Kildare
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Sutton House Hospitality Ltd., & Queenspoint Ltd
Also roofing in Kildare
Partial demolition, extension, renovation and re-roofing of dwelling and garage.
2660151 · 17 Jul 2026
New bungalow with garage, foul sewer connection and entrance widening.
25184 · 03 Jun 2026
New chalet bungalow with garage and wastewater system.
2660362 · 26 May 2026
New dormer house with garage and waste treatment system.
2660336 · 25 May 2026
Four 3-bedroom detached dwellings and extension with wastewater treatment.
2660298 · 14 May 2026
New bungalow with septic tank, percolation area, entrance.
2561478 · 11 May 2026