Industrial planning project
Project scope
for the construction of an anaerobic digestion facility to produce renewable biomethane, CO2 (which will be captured), and a bio-based fertiliser from organic material. The total gross floor area of the proposed development (including internal plant areas and ancillary structures) will be c. 6,007 sq.m. The development will consist of the following: Construction of 2 no. primary digesters (with an overall height of c. 9.1m), a digestate storage tank (with a height of c. 11.3m), a pump house (with a gross floor area (GFA) of c. 362 sq.m), 2 no. post digester tanks (with an overall height of c. 9.1m), and a safety flare (c. 11.3m in height), located in the southeastern section of the site. Construction of 2 no. prepits (c. 4.3m in height), a pasteurisation buffer tank (c. 4.3m in height), and a pasteurisation unit (with a maximum height of c. 4.2m), located to the west of the primary digesters, within the southern section of the site. Construction of digestate treatment and feedstock reception building and odour abatement system (with a GFA of c. 2,797 sq.m and a height of c. 12.1m and c. 16.2m to top of odour abatement stack) located within the southwestern section of the site. Construction of roofed silage clamps (with a GFA of 2,424 sq.m and a height of c. 8.7m) and a fuel storage tank (c. 2m in height), located within the western section of the site. Construction of a combined heat and power (CHP) unit (with a GFA of c. 39 sq.m and a height of c. 2.6m and c. 5.6m to top of flue), a biogas boiler (c. 2.6m in height and c. 5.6m in height to top of flue), a backup boiler (c. 2.6m in height), located within the northern section of the site. Construction of a gas treatment unit (c. 4.2m in height), a grid injection unit (with a GFA of c. 22 sq.m and a height of c. 2.8m), and a CO2 liquefactor (with an overall height of c. 10.7m to top of storage vessels) a propane tank compound accommodating 2 no. propane tanks (c. 1.6m in height), and an ESB substation (with a GFA of c. 24 sq.m and a height of c. 3.4m), located within the northern section of the site. Construction of a two storey ancillary administration building (with a GFA of c. 327 sq.m and a height of c. 11m) within the northern section of the site, adjacent to the site entrance. Alterations to the adjacent local road and site access road, including junction improvement and widening and site entrance and access arrangements. Associated and ancillary works including parking (9 no. standard, 2 no. EV and
Ballyvass , Castledermot , Co. Kildare
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
CycleØ IE Limited
Also groundworks in Kildare
Partial demolition, extension, renovation and re-roofing of dwelling and garage.
2660151 · 17 Jul 2026
Five-bedroom two-storey dwelling, garage, wastewater treatment system.
2660418 · 10 Jun 2026
Duration extension, site subdivision, two-storey dwelling, revised design.
2649 · 08 Jun 2026
New bungalow with garage, foul sewer connection and entrance widening.
25184 · 03 Jun 2026
New chalet bungalow with garage and wastewater system.
2660362 · 26 May 2026
New dormer house with garage and waste treatment system.
2660336 · 25 May 2026