Electricity Supply Board (ESB) intends to apply for permission for development of a 38 kV/MV Gas Insulated Switchgear (GIS) Electrical Substation at this site (1.31ha) at Kerry Technology Park, Dromthacker, Tralee, Co. Kerry. The site is generally bound to the north by the Kerry Technology Park access road (subject to planning permission Ref: 2360295); to the east by the rear of residential properties; to the south by the Knockawaddra Road and the rear of residential and commercial properties along the Knockawaddra Road and to the west by an existing office building and associated car parking area. The proposed development will consist of: • Construction of a substation compound of approximately 2,006m2 gross area enclosed by a 2.6m high stone wall along the northern perimeter of the substation and a 2.6 m high palisade fence around the eastern, southern and western sides of the perimeter of the substation, with the following electrical plant within the substation: • 1 No. prefabricated 38 kV GIS module and foundation (c.31.0m2 and c.5.1 m high); • 1 No. prefabricated MV GIS module and foundation (c.34.0 and c.4.6m high); • 1 No. prefabricated Control Room module and foundation (c.34.0m2 and c.4.6 m high); • 2 No. 38/20 kV 10 MVA transformers and associated bunds (c.45.85m2, c.4.7 m high ea.); • 1 No. House Transformer (c. 7.4 m2 and c. 1.3 m high); and • All associated and ancillary outdoor electrical equipment and other apparatus, including installation of underground cables. • Internal access road within the proposed substation compound. • Site access road and footpath from the existing internal technology park road and footpath. • All associated site development works above and below ground including provision of lighting, boundary fences, landscaping, site services including drainage and all other works.
Kerry Technology Park , Dromthacker , Tralee
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Applicant identity + registered company (when applicable) unlocks with early access.
Also electrical in Kerry
Renovation and extension of dwelling with wastewater treatment.
2560934 · 09 Jul 2026
New single-storey dwelling with attic and site works.
2660415 · 06 Jul 2026
Hotel extension: 27 bedrooms, gymnasium, lift, parking and utilities.
2660588 · 25 Jun 2026
Factory to operations centre conversion with fit-out and welfare facilities.
2660544 · 15 Jun 2026
Basement conversion and extension for apartments and guest bedrooms.
2698 · 12 Jun 2026
Office to two residential apartments conversion with site works.
2660529 · 11 Jun 2026