Dublin City / Fingal / DLR / SDCC
Dublin,
the pipeline.
Every live construction project across Dublin City / Fingal / DLR / SDCC— planning, approvals and sites moving on the ground. Tagged by sector, trade and value. Free to browse; contacts open to early access.
Air conditioning installation and minor structural alterations with fire precautions.
WEB1109/26 · 17A New Bride Street, Portobello, Dublin 8, D08 Y80E
Commercial
—
Commercial office/retail extension with mansard roof replacement and rear extension works.
WEB1254/26 · 44/45, Saint Stephen's Green, Dublin 2, D02 WE19
Commercial
—
Supervalu building elevation changes, fire escape, and fascia/signage replacement.
WEB2358/26 · Supervalu Sundrive, Sundrive Shopping Centre, Unit 14/15, Sundrive Road, Kimmage, Dublin 12, D12NA09
Commercial
—
Retail unit subdivision with fire wall, new glazing, separate entrances.
WEB2030/26 · 41, Cherryfield Avenue Lower, Ranelagh, Dublin 6, D06 FH99
Commercial
—
Subdivision of retail unit into two spaces with fire safety and fit-out works.
WEB1075/26 · Unit 1 Cameron Court, Cork Street, Dublin 8, D08FYV0
Commercial
—
Two-storey modular soft-play building with parking modifications and landscaping.
WEB2622/25 · Saint Finians National School, Glenties Park, Finglas Park, Dublin 11
Commercial
—
The development will consist of : Installation of a new sprinkler water storage tank and sprinkler fire pump house enclosure to the outside south-western elevation of existing warehouse building, alterations to south-western elevation of warehouse building and associated site works.
FW25A/0557E · Musgrave Central Distribution Centre, Unit 14-16 Blanchardstown Corpor
Commercial
—
Planning permission sought to : Remove existing mezzanine floor of 155.99m2 and construct a mezzanine floor of 765.32m2 and associated stair cores within the existing retail unit. The proposed mezzanine level will be used solely for retail use incidental to the existing retail unit (Unit 10) .The proposed development also includes the development of a new fire exit door at the rear elevation along with all associated site works.
FW25A/0478 · Unit 10, Westend Retail Park, Blanchardstown, Dublin 15
Commercial
—
Retention and replacement of rooftop HVAC and fire compliance units.
WEB1276/26 · The Capel Building, Mary's Abbey, Dublin 7, D07 T2W1
Commercial
—
Protected structure: AC installation with structural and fire safety works.
WEB1087/26 · 17A New Bride Street, Portobello, Dublin 8, D08 Y80E
Commercial
—
Retail unit subdivision with fire wall, glazing, and new facilities.
WEB6058/25 · Unit 1 Cameron Court, Cork Street, Dublin 8, D08FYV0
Commercial
—
Planning Permission for 2 number above ground static firefighting water storage tanks and associated site works.
FW25A/0549E · National Orthopaedic Hospital Cappagh, Rathoath Road, Finglas, Dublin
Commercial
—
AC units, condenser installation, fire precautions in protected structure.
WEB5890/25 · 17A New Bride Street, Portobello, Dublin 8, D08 Y80E
Commercial
—
External fire escape stairs for office subdivision.
SD25A/0185W · 3030, Lake Drive, Citywest Business Campus, Dublin 24, D24KX6Y
Commercial
—
Fire escape doors and internal layout modifications.
WEB2809/25 · 22/23, Talbot Street, Dublin 1, D01 DW02
Commercial
—