PROTECTED STRUCTURE : The proposed development is for pitch lighting to the three playing pitches on the school campus and will consist of: 5 no. 18.3m lighting poles to the main synthetic pitch no.1, 6 no. 18.3m high lighting poles to the main grass pitch no. 2 and 4 no. 15m high lighting poles to the synthetic training pitch no.3. The proposed works are situated within the curtilage of a protected structure, St. Michaels House. A Natura Impact Statement has been prepared in respect of the proposed development.
St Michael's College, Ailesbury Road, Dublin 4
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Individual applicants’ names are held out of public view on ConstructionLeads.ie for privacy reasons. Contractors quoting for the works will reach out through the agent below.
Also electrical in Dublin
Garden room with home office replacing removed shed, larger footprint.
SD26B/0262W · 09 Jul 2026
Ground floor extension with study, bedroom and ensuite.
ED26/0064 · 08 Jul 2026
The development will consist of the installation of a compact modular substation and ancillary site development works to facilitate 6 no. shared electric vehicle charging units and 12 no. charging bays within a partially reconfigured parking area in the existing car park
F26A/0379E · 07 Jul 2026
Retail to office conversion 185m2 with site development works.
SD26A/0161W · 06 Jul 2026
The development will consist of attic conversion to include new rear facing dormer & rooflights to front elevation of the existing end of terrace two storey dwelling.
FW26A/0192E · 06 Jul 2026
Single dwelling construction.
V/043/26 · 06 Jul 2026