PROTECTED STRUCTURE: We, the Board of St Patrick's Cathedral, intend to apply for permission for works at St Patrick's Cathedral, South Porch, St. Patrick's Close, Dublin 8 (a protected structure RPS ref. no. 6443 & 6444 and a Recorded Monument DU018-020269). The works will include the following: 1. Removal of the west-facing leaded window with clear and plain coloured glass (WD 04) in the South Porch entrance without damage and in accordance with an approved conservation method statement, to be securely stored within the cathedral grounds, and retained for use in future repair works to similar windows. 2. Installation of a new stained-glass window by the stained-glass artist Thomas Denny, to commemorate those who died, served and lived through, the global COVID-19 pandemic.
St Patrick's Cathedral, South Porch, St Patrick's Close, Dublin 8, D08 H6X3
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Individual applicants’ names are held out of public view on ConstructionLeads.ie for privacy reasons. Contractors quoting for the works will reach out through the agent below.
Also glazing in Dublin
Retention of roof canopy to front of house and retention for attic conversion with dormer projecting window to rear roof for playroom / storage use and all associated site works.
SD26B/0166W · 09 Jul 2026
Garage conversion to playroom with glazed window and elevational treatment changes.
SD26B/0257W · 09 Jul 2026
Attic conversion with roof modification, windows and dormer.
SD26B/0161W · 09 Jul 2026
Attic conversion with gable raising, dormers and velux windows.
SD26B/0037 · 08 Jul 2026
Single detached dormer dwelling with 15 sqm ground floor space.
D26A/0367/WEB · 08 Jul 2026
The proposed development will consist of (i) the construction of 32 no. houses comprising 2 no. detached 4 bed single-storey houses, 6 no. semi-detached 2 bed single-storey houses, 4 no. detached 3 bed two-storey houses, 12 no. semi-detached 3 bed two-storey houses and 8 no. detached 4 bed two-storey houses, (ii) provision of a temporary wastewater treatment plant to be connected to existing foul sewer pumping station, (iii) provision of public open spaces and landscaping, (iv) site services and (v) all associated site works. A Natura Impact Statement (NIS) has been prepared for the proposed development. Additional Information Received 12/05/2026
F25A/0845E · 06 Jul 2026