Development to permanently extend and upgrade the existing planning permission reference no. 1674/08 (which permits a “Seasonal” Sports Air Dome covering 3 no. Tennis Courts) to permission for development for an “All Season” Sports Air Dome to permanently cover the same 3 no. existing tennis courts (currently covered to date on a seasonal basis) for indoor play utilising the same Sports Air Dome structure that currently exists on site and all associated works.
National Tennis Centre, Albert College Park, Glasnevin, Dublin 9, D09K6PT
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Individual applicants’ names are held out of public view on ConstructionLeads.ie for privacy reasons. Contractors quoting for the works will reach out through the agent below.
Also steel in Dublin
New 739m² industrial steel portal frame building with insulation.
SD26A/0084W · 08 Jul 2026
Three-storey over basement residential apartment block development.
D26A/0360/WEB · 03 Jul 2026
Two three-storey detached houses with parking, walls and drainage.
F26A/0370E · 03 Jul 2026
Replacement of rusty steel post with block support structure.
D26B/0283 · 01 Jul 2026
New canopy and associated structural works installation.
D26B/0189/WEB · 01 Jul 2026
Large-scale residential development: 569 units on protected structure site.
WEBLRD9008/26-S3 · 30 Jun 2026