The change of use and extension of the existing single storey, detached, pre-school playgroup and after-school child care facility, 45.54 sq metres total floor area, to use as a two-storey, detached, two bed residential dwelling, 84.35 sq metres total floor area (area of extension 38.81 sq metres). Also for the subdivision of the overall site to accommodate the new detached dwelling (overall site area c. 325.85 sq metres, site area of new dwelling c. 191.74 sq metres, new site area of existing dwelling c. 134.11 sq metres ). Also for changes to the glazing of the existing dwelling. Also for the modification of the existing boundary walls and new boundary, to include a new pedestrian entrance to the front and new internal boundary fence, and associated site works to facilitate the development. Also for the modification of the existing surface water and foul water services to accommodate the new dwelling.
19, The Orchard, Killester, Dublin 5, D05 D613
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Individual applicants’ names are held out of public view on ConstructionLeads.ie for privacy reasons. Contractors quoting for the works will reach out through the agent below.
Also groundworks in Dublin
Two storey dwelling modifications, floor area reduction, roof and layout changes.
SD26B/0195W · 09 Jul 2026
Demolition and wrap-around single storey extension with parking.
SD26B/0175W · 09 Jul 2026
Two-storey end-terrace dwelling with ground-floor alterations and boundary modifications.
SD26A/0115W · 09 Jul 2026
Garage conversion with pitched roof, porch and entrance widening.
SD26B/0265W · 09 Jul 2026
Dwelling to medical practice with two-bed apartments, parking and amenities.
SD25A/0304W · 08 Jul 2026
Ground floor extension with study, bedroom and ensuite.
ED26/0064 · 08 Jul 2026