The development will consist of the relocation of the existing warehouse roller shutter doors and the personnel door. The provision of one newly installed ground level roller shutter door, and up to two new dock levellers to the north-east elevation, which may be installed in phases as required; and the expansion of the existing loading bay with the provision of a new fire escape door to the south-west elevation to facilitate compliance with the granted Fire Safety Certificate, and all the associated works.
Unit 09, Cappagh road, Stadium business park, Dublin 11
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
M7 REAL ESTATE IRELAND LIMITED
CRO 667565- Company type
- LTD - Private Company Limited by Shares
- Incorporated
- 2020-03-02
- Registered address
- 1ST FLOOR, 118 LOWER BAGGOT STREET, DUBLIN 2, DUBLIN 2, DUBLIN, IRELAND
Also doors & joinery in Dublin
Gable wall raising with rear dormer and new bedroom.
SD26B/0181W · 09 Jul 2026
Two storey dwelling modifications, floor area reduction, roof and layout changes.
SD26B/0195W · 09 Jul 2026
Two-storey end-terrace dwelling with ground-floor alterations and boundary modifications.
SD26A/0115W · 09 Jul 2026
Retention for side and rear extensions, garage conversion.
SD26B/0160 · 09 Jul 2026
Retention of roof canopy to front of house and retention for attic conversion with dormer projecting window to rear roof for playroom / storage use and all associated site works.
SD26B/0166W · 09 Jul 2026
Attic storage conversion with dormer, rooflights and gable works.
SD26B/0180W · 09 Jul 2026