Additional mezzanine floor area within an existing warehouse unit and adding a new external prefabricated unit, adding a total of 989 sqm to the existing warehouse unit area, upgrade of the rear boundary fence and gates to the east and west with 2no heavy duty sliding gates and visual reduced look through fencing, and solar panel areas (approximately 1531 sqm) at roof level and all associated site development works on a 0.98 hectare site at North City Business Park, Cappoge, Finglas, Dublin 11 at units A4a and A4b Additional Information Received 19/03/2026
North City Business Park, Cappoge, Finglas, Dublin 11, Units A4a and A
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Individual applicants’ names are held out of public view on ConstructionLeads.ie for privacy reasons. Contractors quoting for the works will reach out through the agent below.
Also steel in Dublin
New 739m² industrial steel portal frame building with insulation.
SD26A/0084W · 08 Jul 2026
Three-storey over basement residential apartment block development.
D26A/0360/WEB · 03 Jul 2026
Two three-storey detached houses with parking, walls and drainage.
F26A/0370E · 03 Jul 2026
Replacement of rusty steel post with block support structure.
D26B/0283 · 01 Jul 2026
New canopy and associated structural works installation.
D26B/0189/WEB · 01 Jul 2026
Large-scale residential development: 569 units on protected structure site.
WEBLRD9008/26-S3 · 30 Jun 2026