The development will consist of amendments to the grid connection infrastructure between the approved solar photovoltaic (“PV”) energy development on lands at Mainscourt, Ballyboghill, Co. Dublin and the ESB Mountgory 38kV Substation, Swords Business Park, Swords, Co. Dublin permitted under Register Reference F22A/0365 comprising the laying of underground electricity cables in ducts and associated infrastructure within the margin of the R132 road and also beneath a portion of Balheary Park including under the Ward River by means of horizontal directional drilling. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. Additional Information Received 29/10/2025 Clarification of Additional Information Received 13/02/2026
South west corner of Balheary Park, Swords, Co. Dublin, and on the wes
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Mainscourt Solar DAC
Also electrical in Dublin
Garden room with home office replacing removed shed, larger footprint.
SD26B/0262W · 09 Jul 2026
Ground floor extension with study, bedroom and ensuite.
ED26/0064 · 08 Jul 2026
The development will consist of the installation of a compact modular substation and ancillary site development works to facilitate 6 no. shared electric vehicle charging units and 12 no. charging bays within a partially reconfigured parking area in the existing car park
F26A/0379E · 07 Jul 2026
The proposed development will consist of (i) the construction of 32 no. houses comprising 2 no. detached 4 bed single-storey houses, 6 no. semi-detached 2 bed single-storey houses, 4 no. detached 3 bed two-storey houses, 12 no. semi-detached 3 bed two-storey houses and 8 no. detached 4 bed two-storey houses, (ii) provision of a temporary wastewater treatment plant to be connected to existing foul sewer pumping station, (iii) provision of public open spaces and landscaping, (iv) site services and (v) all associated site works. A Natura Impact Statement (NIS) has been prepared for the proposed development. Additional Information Received 12/05/2026
F25A/0845E · 06 Jul 2026
Two-storey semi-detached dwelling 91m2 with ancillary works.
SD21A/0074/EP · 06 Jul 2026
Single dwelling construction.
V/043/26 · 06 Jul 2026