The retention development consists of the erection of a 2 metre high double leaf aluminium vehicular gate of 3.475 metres width and a single leaf aluminium pedestrian gate of 0.74 metres width, hung on two pillars 2.148m high. Permission is sought to cut back the two pillars so as to provide clear and safe sight lines in each direction as required by DMURS. The gates provide continued vehicular and pedestrian access to the rear garden area of Mount Verona from Martello Avenue as per previous access.
Mount Verona House, 6 Summerhill Road, Dun Laoghaire, Co. Dublin, A96K302
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Individual applicants’ names are held out of public view on ConstructionLeads.ie for privacy reasons. Contractors quoting for the works will reach out through the agent below.
Also doors & joinery in Dublin
Gable wall raising with rear dormer and new bedroom.
SD26B/0181W · 09 Jul 2026
Two storey dwelling modifications, floor area reduction, roof and layout changes.
SD26B/0195W · 09 Jul 2026
Two-storey end-terrace dwelling with ground-floor alterations and boundary modifications.
SD26A/0115W · 09 Jul 2026
Retention for side and rear extensions, garage conversion.
SD26B/0160 · 09 Jul 2026
Retention of roof canopy to front of house and retention for attic conversion with dormer projecting window to rear roof for playroom / storage use and all associated site works.
SD26B/0166W · 09 Jul 2026
Attic storage conversion with dormer, rooflights and gable works.
SD26B/0180W · 09 Jul 2026