a) the modification to existing rear single storey extension of the existing two storey dwelling, including 3 no. roof lights, b) alterations to the internal layout at ground floor level of the existing dwelling, c) the provision of solar PV solar panels d) the relocation of existing overhead ESB wires, e) the construction of a two storey dwelling to the right-hand side of the existing dwelling, including a single storey part to the rear, f) the provision of 3 no. roof lights to the rear, g) the provision of solar PV solar panels, h) the extension of the existing roof to connect both dwellings, i) the subdivision of the rear garden to provide separate rear access to each dwelling, j) the provision of a paved terrace to the rear of both dwellings, k) alterations to drainage, alterations to front and side boundary treatments, l) removal of existing storage sheds, m) landscaping, permeable paving, rainwater harvesting butts, gravel soakpits, all associated site and other works.
31, The Rise, Woodpark, Dublin, D16PP68
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Individual applicants’ names are held out of public view on ConstructionLeads.ie for privacy reasons. Contractors quoting for the works will reach out through the agent below.
Also roofing in Dublin
Gable wall raising with rear dormer and new bedroom.
SD26B/0181W · 09 Jul 2026
Phased extension, attic conversion, garden room with shed removal.
SD26B/0244W · 09 Jul 2026
Garage conversion with pitched roof, porch and entrance widening.
SD26B/0265W · 09 Jul 2026
Retention of roof canopy to front of house and retention for attic conversion with dormer projecting window to rear roof for playroom / storage use and all associated site works.
SD26B/0166W · 09 Jul 2026
Attic storage conversion with dormer, rooflights and gable works.
SD26B/0180W · 09 Jul 2026
Two storey dwelling modifications, floor area reduction, roof and layout changes.
SD26B/0195W · 09 Jul 2026