1) Construct an extension to the side of the house at (a) ground level, (b) first-floor level and (c) at attic level by way of an extended dormer roof structure. 2) Construct a dormer style structure at attic level to increase the existing attic floor area. 3) Remove the existing concrete roof off the bay window to the front and replace it with a warm deck flat roof with a zinc sheeting finish. 4) To demolish existing single storey side extension. 5) All ancillary ground works in association with the above-mentioned works. RETENTION PERMISSION SOUGHT FOR: 1) The existing front porch which was constructed over an existing concrete ramp area. 2) Retention being granted for the porch, Permission to replace the tiled sloped roof with a flat warm deck roof with a zinc sheeting finish. 3) Retention for the front of house plaster over the original brick finish.
30, Oakton Park, Ballybrack, Glenageary, Co. Dublin, A96Y6R0
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Individual applicants’ names are held out of public view on ConstructionLeads.ie for privacy reasons. Contractors quoting for the works will reach out through the agent below.
Also groundworks in Dublin
Demolition and wrap-around single storey extension with parking.
SD26B/0175W · 09 Jul 2026
Two-storey end-terrace dwelling with ground-floor alterations and boundary modifications.
SD26A/0115W · 09 Jul 2026
Garage conversion with pitched roof, porch and entrance widening.
SD26B/0265W · 09 Jul 2026
Two storey dwelling modifications, floor area reduction, roof and layout changes.
SD26B/0195W · 09 Jul 2026
Ground floor extension with study, bedroom and ensuite.
ED26/0064 · 08 Jul 2026
Dwelling to medical practice with two-bed apartments, parking and amenities.
SD25A/0304W · 08 Jul 2026