grantedResidential·Dún Laoghaire-Rathdown County Council

The development will consist of: The removal of the side entrance porch to the northerly building no.1 (South Side Storage), the lean-to structure to north westerly building no.2 (Smith Automotive) and ancillary structures to the north west to facilitate the development. The proposed works will include: The part vacation of the existing South Side Storage (from Building 5) and rearrangement within the existing buildings (to Building 2) by way of modification and extension to the rear of building no.1 at ground floor level; and the modification and extension of building no.2 at ground and first floor level; a new two storey link building is proposed between buildings no.1 and no.2 to provide additional storage space and improved internal connectivity between the storage facility; 2no. new customer loading bays at the entrance to building no.2; The extension and renovation to the rear and side of the south western building no.3 (former DD Catering unit) at ground and first floor levels to accommodate the relocation of The Stone Studio (ancillary showroom space); and all associated site development and landscaping works.

Southside Storage, Murphystown Road, Leopardstown, Dublin 18, D18V5N8

Street view of the planning site
Satellite view at 53.26487, -6.21264

Satellite · Zoom 19

Trades in scope

Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.

Applicant

Private applicantIndividual

Individual applicants’ names are held out of public view on ConstructionLeads.ie for privacy reasons. Contractors quoting for the works will reach out through the agent below.