INSTALLATION OF HIGH-POWER ELECTRIC VEHICLE CHARGING POINTS AND ASSOCIATED INFRASTRUCTURE CONSISTING OF THE FOLLOWING: (1) INSTALLATION OF 8 NO. ELECTRIC VEHICLE CHARGING BAYS WITH 8 NO. TESLA ILLUMINATED CHARGING UNITS AND ASSOCIATED SIGNAGE, (2) INSTALLATION OF PROPOSED TESLA SUPERCHARGER POWER CABINET EQUIPMENT, (3) INSTALLATION OF PROPOSED MODULAR SUBSTATION, (4) ERECTION OF ASSOCIATED EV SIGNAGE, (5) RELOCATION OF AN EXISTING LIGHTING POLE AND (6) ALL ASSOCIATED SITE DEVELOPMENT WORKS INCLUDING SURFACING, LIGHTING AND LINE MARKING
TESLA EV CHARGING HUB , THE ALLINGHAM ARMS HOTEL , WEST END BUNDORAN
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Applicant identity + registered company (when applicable) unlocks with early access.
Also groundworks in Donegal
Garage extension with granny flat and service connections.
2661295 · 14 Jul 2026
Outhouse or garage construction.
2650098 · 14 Jul 2026
Demolition and new 313m² dwelling with septic tank.
2661291 · 13 Jul 2026
Wastewater treatment system with soil polishing filter.
2661288 · 13 Jul 2026
Dwelling extension with full service connections.
2661294 · 13 Jul 2026
Design change for 222m² house build.
2661293 · 13 Jul 2026