(1) CONSTRUCTION OF A NEW HOUSE (244.4M2 INCLUDING BALCONY), DOMESTIC OFFICE AND HOME GYM (49.1M2), WITH A CURTILAGE, GRAVELLED AREA (152.6M2). THE TIMBER BUILDINGS ARE TO BE BUILT USING CIRCULAR HOLLOW SECTION GALVANISED COLUMNS (CHS) ON SEPARATE PAD FOUNDATIONS: 28 PADS WILL MEASURE 1M2 AND 2 PADS WILL BE 4M2, (2) INSTALLATION OF A NEW SECONDARY WASTEWATER TREATMENT SYSTEM CONSISTING OF A BIOLOGICAL AERATED FILTER TREATMENT PLANT TOGETHER WITH A TERTIARY SAND POLISHING FILTER BED OF 13.5 M2 AND (3) A STORMWATER AND DRAINAGE MANAGEMENT LAYOUT PLAN INCLUDE AN OIL FILTER AND PREVENTION OF WATER ENTERING THE POLISHING FILTER BED BEFORE IT IS DISCHARGED TO THE GROUND. MAINS WATER IS AVAILABLE ON SITE. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
MARBLE HILL , PORTNABLAGH , LETTERKENNY PO
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Applicant identity + registered company (when applicable) unlocks with early access.
Also groundworks in Donegal
Garage extension with granny flat and service connections.
2661295 · 14 Jul 2026
Outhouse or garage construction.
2650098 · 14 Jul 2026
Demolition and new 313m² dwelling with septic tank.
2661291 · 13 Jul 2026
Wastewater treatment system with soil polishing filter.
2661288 · 13 Jul 2026
Dwelling extension with full service connections.
2661294 · 13 Jul 2026
Design change for 222m² house build.
2661293 · 13 Jul 2026