A PERIOD OF 10 YEARS FOR DEVELOPMENT CONSISTING OF CONSTRUCTION OF 42 NO. NEW DWELLING UNITS COMPRISING OF 2 NO. 2 BED SEMI-DETACHED DWELLINGS, 4 NO. 3 BED SEMI-DETACHED DWELLINGS, 26 NO. 4 BED SEMI-DETACHED DWELLINGS, 8 NO. 2 BED TERRACED DWELLINGS, 2 NO. 3 BED TERRACED DWELLINGS WITH CONNECTION TO ALL EXISTING SERVICES ALREADY ON SITE INCLUDING FOUL WATER DRAINAGE, STORM WATER DRAINAGE, WATERMAINS, FOOTPATHS, ROADWAYS AND ALL ASSOCIATED SITE WORKS
LISNENAN , LETTERKENNY , CO. DONEGAL
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Applicant identity + registered company (when applicable) unlocks with early access.
Also groundworks in Donegal
Garage extension with granny flat and service connections.
2661295 · 14 Jul 2026
Outhouse or garage construction.
2650098 · 14 Jul 2026
Demolition and new 313m² dwelling with septic tank.
2661291 · 13 Jul 2026
Wastewater treatment system with soil polishing filter.
2661288 · 13 Jul 2026
Dwelling extension with full service connections.
2661294 · 13 Jul 2026
Design change for 222m² house build.
2661293 · 13 Jul 2026