10 YEAR PLANNING PERMISSION AND A 30 YEAR OPERATIONAL LIFE FOR THE DEVELOPMENT. THE DEVELOPMENT OF A WIND FARM CONSISTING OF (1) ERECTION OF (A) FIVE WIND TURBINES OF A TOTAL CAPACITY OF 4.99MW, OF A TOTAL OVERALL TIP HEIGHT OF 86M (B) AN ONSITE MEDIUM VOLTAGE (MV) SUBSTATION (C) A TEMPORARY CONSTRUCTION COMPOUND, (D) SITE SIGNAGE (2) PROVISION OF A SITE ENTRANCE, (3) INSTALLATION OF UNDERGROUND CABLING CONNECTING THE TURBINES, (4) ASSOCIATED SITE ACCESS TRACKS, AND ALL ANCILLARY SITE DEVELOPMENT WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE 2023/2413)
CROAGHNASHALLOG , DONEGAL PO , CO. DONEGAL
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Applicant identity + registered company (when applicable) unlocks with early access.
Also electrical in Donegal
Garage extension with granny flat and service connections.
2661295 · 14 Jul 2026
182m² dwelling with storage shed and septic tank.
2661290 · 13 Jul 2026
Demolition and new 313m² dwelling with septic tank.
2661291 · 13 Jul 2026
Dwelling extension with full service connections.
2661294 · 13 Jul 2026
New 280m² dwelling with garage and sewage treatment.
2661289 · 13 Jul 2026
Demolition and new 228m² dwelling with sewage system.
2661292 · 13 Jul 2026