appliedIndustrial·Cork City Council
Permission for the installation of solar panels on a steel frame structure over an existing telecommunications cabin (covering an area of approximately 42 sq.m., to a maximum height not exceeding 5.0 metres above ground level). Works to include all ancillary development works.
ESB Telecoms Ltd Telecommunications Compound, ESB's Kilbarry 110kV Substation, Old Whitechurch Road, Cork
Also solar pv in Cork
Madigan's Solar Farm construction and installation.
26/1755 · 29 Jun 2026
Solar farm development by Amarenco Solar Inniscarra Limited.
26/1721 · 25 Jun 2026
Dwelling with solar PV system and wastewater treatment
26/1104 · 21 Jun 2026
10-year solar farm permission on 13.6 hectare site.
26/1641 · 18 Jun 2026
Installation of 661.4m2 roof-mounted solar photovoltaic system.
26/44649 · 14 Jun 2026
Installation of 2674m2 roof-mounted solar photovoltaic system.
26/44648 · 14 Jun 2026