1) Retention of the existing attic conversion, including 3 no. roof windows to the rear and a gable window to the side. 2) Retention and completion of a single storey extension under construction to the rear of the dwelling. 3) Construction of a proposed single storey extension to the front and side of the dwelling. 4) Retention of the existing boundary wall and fencing to the side and front corner of the property, in a proposal that will include Permission for modifications to the existing fencing and proposed additional screen planting adjacent to the wall and fence.
82 Cairn Woods, Ballyviniter Lower, Mallow Co. Cork, P51 XHW0
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Individual applicants’ names are held out of public view on ConstructionLeads.ie for privacy reasons. Contractors quoting for the works will reach out through the agent below.
Also roofing in Cork
New dwelling house construction.
26/1850 · 09 Jul 2026
Retention for change of roof type on existing structure.
26/44639 · 09 Jul 2026
Single storey rear extension and additional works to dwelling.
26/1299 · 09 Jul 2026
Works to existing two-storey detached dwelling.
26/1851 · 09 Jul 2026
Retention of single storey extension to dwelling.
26/1848 · 09 Jul 2026
New dwellinghouse construction with site works.
26/1298 · 09 Jul 2026