for (a) 12 no. 2MW Hydrotreated Vegetable Oil (HVO) generators; (b) 6 no. self-bunded 69m3 HVO tanks; (c) 6no. self-bunded 6m3 AdBlu tanks; (d) a 182m2 electrical/control building: (e ) a customer electrical compound complete with a transformer; (f) an ESB compound connected to the existing adjacent 110kV ESB substation situated immediately east of the proposed development; (g) a fuel loading bay complete with a 7,700L forecourt separator; (h) on site surface soakaways; (i) task lighting columns; (j) 3m high perimeter security fencing and compound separation; (k) new road entrance off the R458; (l) all associated internal access roads, car parking, surface water collection, ducting as required to deliver the works. The proposed development will include connection to public water mains. There is no sewer connection required as foul and process waste will be collected in an underground sealed tank and emptied by a specialist waste service provider. An Appropriate Assessment Screening Report has been prepared for the site. The application relates to a development which comprises an activity requiring an industrial Emissions Directive (IED) licence.
Drumline , Co. Clare
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Drumline FlexGen Ltd
Also electrical in Clare
Refurbish presbytery to respite home, demolish outbuildings, extensions.
2660451 · 10 Jul 2026
39 new houses with roads, paths and services connection.
2660449 · 10 Jul 2026
Complete partially erected dwellinghouse and connect services.
2660450 · 10 Jul 2026
New dwelling house, garage, wastewater treatment system.
2660440 · 09 Jul 2026
Demolish damaged dwelling, construct replacement house.
2660444 · 09 Jul 2026
Change commercial building to residential with internal alterations.
2660443 · 09 Jul 2026