to Extend the Appropriate Period of Planning permission for P20/562 the development will consist of a planning permission for a period of 5 years to construct and complete a Solar PV Energy development with a total site area of 99.2 hectares, to include a single storey electrical substation building, electrical transformer and invertor station modules, solar PV panels ground mounted on support structures, internal access tracks, security fencing, electrical cabling and ducting, CCTV and other ancillary infrastructure, drainage, additional landscaping and habitat enhancement as required and associated site development works including works relating to the access to the site. The Solar farm will be operational for 35 years. A Natura Impact Statement has been prepared in respect of this planning application
Manusmore , Clarecastle , Co. Clare
Satellite · Zoom 19
Trades in scope
Classified from the works description, held to a strict confidence threshold before publication. Low-confidence tags are held for review rather than shown.
Applicant
Manusmore Solar Limited
Also solar pv in Clare
Install 505kWp rooftop solar system on industrial warehouse blocks.
2660435 · 07 Jul 2026
Roof-mounted photovoltaic panels on existing metal-roof industrial building.
2660039 · 29 Jan 2026
Solar farm amendments: poles, masts, overhead and underground grid connection lines.
2560563 · 16 Sept 2025
Large-scale solar farm with ground-mounted PV arrays and 110kV grid connection.
2560560 · 11 Sept 2025
Single dwelling with garage, solar panels and wastewater system.
2560552 · 07 Sept 2025
Restore derelict farm buildings, new extensions, security wall and solar installation.
25265 · 13 Aug 2025